Home
What Is Timber Grid
Contacting Us
Case Histories
Installation Details
Photo Album
 


Case Histories


Landfill Project

The Problem
Within the next decade a huge quarry at Rowley Regis will be completely filled with waste generated by the remaining years of the 20th century and the area will once again return to it natural landscape.

To make this possible, quarry owners needed to construct a new road right down into the lowest levels to allow Landfill access to infill waste in a controlled and systematic way. In doing so a large area of quarry 'hillside' needed to be stabilized.

The Solution
To engineer and install a earth retaining wall to ensure the safe passage of landfill vehicles.

 

The foundations were arranged in 15 steps on the hillside and with a large part of this retaining wall having tandem foundations for the double depth configuration due to the heights involved.

The Result
The wall is a sacrificial structure and will be progressively buried and crossed with reinstated footpaths and eventually landscaped over the next 15 year period. This produced for the landfill company, a solution which utilized "on site" materials combined with the structural components from renewable timber sources to compliment the environmentally friendly aspects of this scheme.

See more case histories.


Other Links
What is Timber Grid | Contacting Us | Case Histories | Installation Details | Photo Album

Top